Level 2 home charging installed in a day by licensed electricians — permit pulled, panel checked, wiring done clean, no surprises on the invoice.
A standard 120V outlet adds 3–5 miles of range per hour. A Level 2 charger adds 25–40. Here's why nearly every EV owner ends up making the upgrade.
Home electricity beats DC fast-charger pricing by a wide margin, every single time. The charger pays for itself just by keeping you out of the charging plaza.
A permitted, hardwired Level 2 circuit is a selling point now and table stakes in a few years. Buyers with EVs check for it.
We've been called to more than one garage where a hardware-store cord was quietly cooking itself under an EV load. A dedicated, properly-sized circuit doesn't do that. Funny how that works.
One flat price, everything on the list. If something about your house changes the price — a long wire run, a full panel — you hear it before we start, not on the invoice.
An EV roughly doubles many households' electric usage. That's also exactly what makes rooftop solar pencil out faster — you're replacing gasoline with sunlight.
We install whatever you've bought or whatever fits — and we'll tell you honestly which ones we'd put in our own garages.
Polished app, reliable hardware, works with everything. A safe pick we install constantly.
Clean, fast, and now charges non-Teslas too (NACS). If you drive a Tesla, this is usually the answer.
Excellent value, great energy-monitoring tie-in. Pairs nicely with whole-home monitoring setups.
Solid smart chargers with strong scheduling features. We've installed plenty of both and they hold up.
Already bought a charger online? Fine by us — we'll install it right. Not sure what to buy? Tell us your car and your panel, and we'll give you a one-sentence answer instead of a comparison chart.
Snap your electrical panel (door open) and where you park. Text or email it over — that's genuinely most of the site visit.
A real price from a real electrician, usually within a day. No "starting at" asterisks.
Most installs are done in a morning. Permit closed out, app configured, car charging before we pull out of the driveway.
For a typical install — panel in the garage or one wall away, decent panel capacity — most homeowners land in the high hundreds to low thousands including the permit, depending on the charger and the wire run. Long runs to a detached garage or a needed panel upgrade move the number, and we'll tell you that up front. Send a photo of your panel and your parking spot and you'll have a flat quote within 24 hours — see the steps above.
Yes. A Level 2 charger is a new dedicated circuit, and every CT town requires an electrical permit and inspection for that. Anyone who says otherwise is asking you to carry the liability if something goes wrong — including with your homeowner's insurance. We pull the permit and meet the inspector as part of every job. It's included, not an upsell.
Often yes, sometimes no, and the only honest way to answer is a load calculation — which we do on every quote, free. If your panel is tight, options in rough order of cost: a load-management device that throttles charging when the house is busy, a smaller charger circuit (a 30A circuit still charges most cars overnight), or a panel or service upgrade. We quote the cheapest option that's actually safe and code-legal.
We usually recommend hardwired. It's cleaner, supports the charger's full output, and skips the 14-50 outlet — which, on cheap receptacles under continuous EV load, is the single most common failure point we see. Plug-in makes sense if you're renting or genuinely plan to take the charger with you. Either way the circuit work and permit are the same job.
Yes — it's just trenching and conduit, which we do all the time. Cost depends on distance and what's between the house and the garage (lawn is cheap, a paved driveway less so). If the detached garage already has a subpanel, it may be a quick job. Include the run in your photos and we'll quote it flat like everything else.
Send us a photo of your panel and your parking spot. Flat-rate quote within 24 hours, install usually within the week — permit and panel check included.
Get a Flat-Rate Quote (860) 426-7283